Description of Project

Review Process Flow drawing for the ducting networks of all floors
Check:
• Blower capacity and line velocity

• Total heat load to establish the acceptable temperature for the working space

• Cold air supply quantity

• Maximum allowable temperature of exhaust air

• Circulating air blower capacity & power requirement

• Plant visit to check each floor of the building, type, size and location of piping system, location and the number of blowers, etc. to check the heat load and power requirements

Short Details

Sectors
No. of Staff :  2 Engineers
Start Date :  March 1, 2017
End Date :  April 30, 2017

Contact Person

Shamsul Islam Khan, Pakiza Woven Fashion Ltd. Cell: 01787-650906