Description of Project

– Measurement of Soil Resistivity at Titas Gas Field Location A&C

– Designing the CP Systems for 2 nos. Gas Gathering Pipelines ( one Loc ‘A’ one Lac ‘C’)

– Installation of Deep Anode Ground Bed (50M) at Titas Gas Field Location ‘A’

– Installation of Sacrificial Mg-anode at Titas Gas Field Location ‘C’

– Installation of Test point for both the Pipeline (Loc ‘A’ & Loc ‘C’)

– Testing, Commission of both the Cathodic Protection Systems.

– Preparation of Operation 2 Maintenance Manual for the CP Systems

Short Details

Sectors
No. of Staff :  Two
Start Date :  March 19, 2014
End Date :  April 21, 2014

Contact Person

Engr, Md Mukhlesur Rahman