Description of Project
– Measurement of Soil Resistivity at Titas Gas Field Location A&C
– Designing the CP Systems for 2 nos. Gas Gathering Pipelines ( one Loc ‘A’ one Lac ‘C’)
– Installation of Deep Anode Ground Bed (50M) at Titas Gas Field Location ‘A’
– Installation of Sacrificial Mg-anode at Titas Gas Field Location ‘C’
– Installation of Test point for both the Pipeline (Loc ‘A’ & Loc ‘C’)
– Testing, Commission of both the Cathodic Protection Systems.
– Preparation of Operation 2 Maintenance Manual for the CP Systems
Short Details
Sectors | |
No. of Staff | : Two |
Start Date | : March 19, 2014 |
End Date | : April 21, 2014 |